08-003 |
DYB |
$406,000.00 |
$406,000.00 |
$0.00 |
$0.00 |
$812,000.00 |
Construct terminal building |
08-002 |
CEU |
$7,400.00 |
$7,400.00 |
$281,217.00 |
$0.00 |
$296,017.00 |
Design services for extending runway 25 and the parallel taxiway by 600' including the runway safety area to meet ARC B-II standards. |
08-001 |
PHH |
$2,808.00 |
$2,808.00 |
$106,694.00 |
$0.00 |
$112,310.00 |
Remove obstructions to runway 18/36 |
07-022 |
6J0 |
$10,281.00 |
$10,281.00 |
$390,691.00 |
$0.00 |
$411,253.00 |
Rehabilitate airfield lighting which consist of runway and taxiway edge lights, and install PAPI's to runway 17/35. |
07-021 |
LQK |
$7,420.00 |
$7,420.00 |
$281,941.00 |
$0.00 |
$296,781.00 |
Design services for a new terminal building, removal of underground storage tank on site of new terminal building, and perform a FAA 405 ANAPC survey to each runway end of 5/23 |
07-020 |
SMS |
$8,421.00 |
$8,421.00 |
$320,000.00 |
$0.00 |
$336,842.00 |
Obstruction removal - tree clearing project needed for an instrument landing system. |
07-019 |
6J4 |
$1,520.00 |
$1,520.00 |
$57,776.00 |
$0.00 |
$60,816.00 |
Install a two-box precision approach path indicator light system (PAPI's) on end of runway 1. |
07-018 |
HVS |
$1,626.00 |
$1,626.00 |
$7,588.00 |
$0.00 |
$10,840.00 |
General aviation terminal building study including development of conceptual drawings and a floor plan layout. |
07-016 |
OGB |
$75,292.00 |
$219,291.00 |
$936,184.00 |
$0.00 |
$1,230,767.00 |
Construction and expansion of the terminal apron and t-hangar taxiway; including engineering design fees and for installing a supplemental wind cone. |
07-015A |
CUB |
$1,857.19 |
$0.00 |
$0.00 |
$0.00 |
$1,857.19 |
Grant Amendment - For project cost overruns related to the runway, TWY B, and apron rehabilitation project |
07-015 |
CUB |
$51,050.00 |
$51,050.00 |
$1,939,882.00 |
$0.00 |
$2,041,982.00 |
Rehabilitate runway 13/31, taxiway "B" and a portion of the apron. |
07-014 |
MKS |
$11,737.00 |
$11,737.00 |
$446,000.00 |
$0.00 |
$469,474.00 |
Construct partial parallel taxiway enabling a full parallel taxiway to serve runway 5/23. |
07-013 |
CDN |
$22,600.00 |
$22,600.00 |
$858,800.00 |
$0.00 |
$904,000.00 |
Construct partial taxiway to complete a full parallel taxiway system for RWY 6/24. |
07-012 |
SMS |
$20,400.00 |
$20,400.00 |
$775,200.00 |
$0.00 |
$816,000.00 |
Relocate a partial parallel taxiway to meet FAA design standards. |
07-010 |
MYR |
$1,000,000.00 |
$1,000,000.00 |
$0.00 |
$2,000,000.00 |
$4,000,000.00 |
Construct a new general aviation terminal building |
07-009 |
LRO |
$500,000.00 |
$500,000.00 |
$0.00 |
$0.00 |
$1,000,000.00 |
Construct new terminal building |
07-008 |
MNI |
$100,166.00 |
$66,777.00 |
$0.00 |
$0.00 |
$166,943.00 |
Construct t-hangar taxiways |
07-007 |
RBW |
$75,122.00 |
$75,122.00 |
$2,854,630.00 |
$0.00 |
$3,004,874.00 |
Construct a parallel taxiway to Runway 5/23 including medium intensity LED edge lights. |
07-006 |
BNL |
$40,149.00 |
$40,149.00 |
$1,525,675.00 |
$0.00 |
$1,605,973.00 |
Taxiway and apron rehabilitation and lighting project |
07-005 |
SPA |
$25,770.00 |
$25,770.00 |
$0.00 |
$0.00 |
$51,540.00 |
New terminal building concept plan |